国产极品裸体av在线激情网,av影院在线免费观看不卡,国产欧美精品aaaaaa片,国产日本精品视频一区二区,日本一区二区在线高清观看,国产日产久久高清ww,久久人妻av无码中文专区,中文字日产幕码三区的做法步,二区三区三区视频在线观看,日本在线一区二区三区不卡

Hello! Welcome to Shenzhen Jintong Display Technology Co., Ltd. (splicing screen)!
中文版 | English
News
Industry trends
Requirements and Environmental Design for LCD Splicing Wall
Number of views:1785order Release Date:2020-11-26
To ensure the smooth implementation of the LCD splicing wall construction project and the normal operation of the system equipment, the construction of the equipment must meet the following environmental conditions:

1、 Power supply

Considering that the system may encounter special situations where there may be a current surge due to the interruption of power supply, the splicing unit itself has a power protection design to ensure the normal and safe operation of the equipment.

1. The power supply voltage should be stable and reliable, especially to prevent immediate power up after power failure. Therefore, in principle, the power supply of the splicing system must be powered by a corresponding power UPS.

2. The splicing system, image controller, and control PC require in-phase power supply.

3. The system equipment should have good grounding, with a grounding resistance of less than 2 Ω, to ensure that the equipment is not damaged in the event of special conditions such as lightning strikes.

4. The power supply of the system is AC 220V ± 5%; Use a three eye socket with a protective grounding wire; The number of sockets is related to the number of splicing units

2、 Light requirements

1. If the windows in the control room are large, direct sunlight should be avoided and curtains should be used to block the light. The curtains should be dark in color.

2. It is recommended to use recessed tube lights for lighting. The lights should not be directly aimed at the screen direction and should be kept at a distance of 3 meters from the screen to avoid affecting the projection effect.

3、 Air conditioning requirements

1. There should be good temperature control and heat dissipation measures in the maintenance channel behind the splicing screen panel. If it is a central air conditioning system, there should be air conditioning inlet and outlet ports. If there is no central air conditioning system, specialized air conditioning should be added, and the power of the air conditioning system depends on the size of the large screen.

2. The temperature inside the maintenance channel and the temperature in the control room of the splicing curtain wall should be controllable and kept basically the same.

4、 Installation requirements

② The cabinet base is usually in direct contact with the anti-static floor to ensure that the ground can withstand gravity for a long time without deformation.

① The installation ground requires a flat and sturdy surface, strong load-bearing capacity, and is not easily deformed.

5、 Requirements for wiring and trunking

1. If it is a fixed floor such as floor tiles or composite wood flooring, it is required that there is a wiring groove between the signal source (computer RGB signal, video signal) and the control computer to the graphics controller (or projector interface), and the shorter the wiring distance, the better.

2. Weak current cables (RGB, video, network, serial port, mouse and keyboard extension cables, etc.) should be routed separately from strong current cables to avoid signal interference. If using cable trays, it is not possible to share one cable tray, and different cable trays should be used for separate wiring.

3. If it is an anti-static floor, holes should be opened at the wiring outlet to leave cable outlets.

6、 System environment

1. The temperature and humidity of the air conditioner before and after splicing the screen should be adjusted to the same scale to ensure the heat dissipation of the splicing wall and the flatness of the splicing screen

2. The fire sprinkler shall be as far away from the splicing wall as possible, and spray extinguishing agent shall be used.

3. The splicing curtain wall room requires cleanliness and dust prevention.

4. The back of the splicing system is a maintenance channel, and the width of the maintenance channel is generally not less than 0.60 meters

5. Large screen rooms require good temperature and humidity control. The working environment temperature is 0 ℃ -40 ℃, and the relative humidity is 10% -90%. There should be air conditioning behind the spliced curtain wall.

7、 Requirements for decoration and equipment location of operation console (room)

1. The placement of the image controller should be located in the aisle (inside the cabinet) next to or behind the curtain wall, and should be as close as possible to the projection box

2. The control computer should be located as close as possible to the opposite direction of the splicing screen and at a suitable distance from it for debugging, color adjustment, and other operations.

3. The position of the operation control computer should be directly opposite the splicing screen, and it is required that the operator can easily and intuitively see the operation of the splicing screen. If there is a dedicated partitioned operation control room, there should be transparent glass between the operation control room and the large screen display room for easy viewing by the operator.


Contact Us
Address: Building B, Lihao Yongda Technology Park, No.1 Dongfang Avenue, Guangming District, Shenzhen
Phone: 0755-23576861
24-hour service hotline: 139 2371 0018

QR code
CopyRight ? 2017 Shenzhen Jintong Display Technology Co., Ltd. All Right Reserved
展開
  • Tel

  • 075523576861
QR code
中文字幕亚洲人妻系列| 亚洲欧美乱日韩乱国产| 日韩免费无码一区二区三区| 亚洲国产A∨无码影院| 日本一区二区在线看看| 日韩精品视频久久一区二区| 免费人妻无码不卡中文字幕18禁 | 国产91久久麻豆黄片| 在线播放亚洲丝袜美腿| 天天爽夜夜爽人人爽一区二区| 久久久精品人妻久久影视| 无码人妻AⅤ一区 二区 三区| 国产精品成人久久a级片| 日韩中文字幕久久久老色批| 国产欧美精品aaaaaa片| 成人午夜视频精品一区| 亚洲 自拍 另类 欧美 综合| 国产在线美女| 国产熟妇一区二区三区网站| 日本黑人乱偷人妻在线播放| 国产精品久久久久aaaa| 国产精品公开免费视频| 久久亚洲精品成人综合| 在线观看二区视频网站二区| 在线观看特色大片免费视频| 久久综合狠狠综合久久| 欧美亚洲国产另类在线观看| 人妻中文字幕一区二区二区| 日本一区二区在线免费看| 久久成人影院精品777 | 亚洲AV毛片无码成人区httP| 国产在线观看网址不卡一区| 91精品国产自拍视频| 日本伊人精品一区二区三区| 国产真实乱对白精彩久久老熟妇女| 日日摸夜夜添狠狠添欧美| 国产小车还是日产的好 | 成在线人av免费无码高潮喷水| 亚洲一本到无码av中文字幕| 伊人婷婷色香五月综合缴激情| 中文字幕被公侵犯的丰满人妻|